-
Review of environmental factors: proposed cuttings remediation works: F3...
This review has been prepared to assess the potential impacts of stabilising cuttings on the F3 Freeway 5.8km north of the Hawkesbury River Bridge to the Calga Interchange. -
Review of environmental factors : F3 widening : volume 1
This report contains a review of the proposed widening of the F3 to three lanes in each direction, from 4.2 kilometres south of Mount White Overbridge to 1.0 kilometres north of... -
Proposed highway link F3 Freeway to Branxton: environmental impact...
This report presents the geological aspects of a geotechnical study on the National Highway extension from Minmi to Branxton. It describes the geology of the area and presents... -
Review of environmental factors: F3 widening: volume 2: appendices
This report contains a review of the proposed widening of the F3 to three lanes in each direction, from 4.2 kilometres south of Mount White Overbridge to 1.0 kilometres north of... -
Proposed heavy vehicle rest area at Berowa: review of environmental factors
The Roads and Traffic Authority (RTA) is proposing to construct a heavy vehicle rest area for the F3 Freeway at Berowra. The proposed heavy vehicle rest area would utilise the...
1 - 5 of 5 results