Managed floodplain with constraints relaxed

Murray-Darling Basin managed floodplain

Created 05/12/2017

Updated 13/11/2024

The managed floodplain includes an area where floodplain vegetation can be influenced with the 2750 GL of environmental water and it includes: • actively managed areas that can receive environmental water via large headwater storages or via The Living Murray ‘environmental works’ sites on the River Murray floodplain • passively managed areas that receive environmental water via flow rules in water resource plans or via natural events • areas that may be inundated with high flows if key constraints are overcome

Source

This data file or API can be downloaded from:

https://devweb.dga.links.com.au/data/dataset/9f97aebc-d89e-48ae-8586-67120a8cfcfa/resource/196d7780-0994-446e-a513-12ec870157c6/download/managed_floodplain_constraints_relaxed.zip