Water Treatment Plant Data

Water Treatment Plant Data, Gladstone Area Water Board

Created 05/05/2025

Updated 05/05/2025

•Raw Water delivered to GWTP and YWTP •Volumetric water treated at GWTP and YWTP •Turbity GWTP and YWTP •Free Chlorine GWTP and YWTP Volumetric water treated is the amount of water pumped out of the treatment plants as final drinking water.

Turbidity and Chlorine averages are calculated from the online instruments and derived from SCADA: turbidity is the average filtered water turbidity: Free Cl is the average free chlorine as measured in the clear water reservoirs.

Source

This data file or API can be downloaded from:

http://www.gawb.qld.gov.au/www.gawb.qld.gov.au/documents/40241572/2dea0043-4efa-4bf8-8bc7-ef7fe1a50c6d