Water Treatment Plant Data
•Raw Water delivered to GWTP and YWTP •Volumetric water treated at GWTP and YWTP •Turbity GWTP and YWTP •Free Chlorine GWTP and YWTP Volumetric water treated is the amount of water pumped out of the treatment plants as final drinking water.
Turbidity and Chlorine averages are calculated from the online instruments and derived from SCADA: turbidity is the average filtered water turbidity: Free Cl is the average free chlorine as measured in the clear water reservoirs.
Source
This data file or API can be downloaded from:
http://www.gawb.qld.gov.au/www.gawb.qld.gov.au/documents/40241572/2dea0043-4efa-4bf8-8bc7-ef7fe1a50c6dResources
There are no views created for this resource yet.
Additional Information
Field | Value |
---|---|
Data last updated | unknown |
Metadata last updated | May 5, 2025 |
Format | CSV |
License | cc-by-4 |
Datastore active | False |
Datastore contains all records of source file | False |
Has views | False |
Id | 7c8f75f6-3347-4336-aee4-fe279f933842 |
Package id | 6b67a5d2-9051-44d6-ab69-b33315ec94d4 |
Position | 0 |
Resource type | file |
State | active |
Zip extract | False |
Size | Unknown |
ID | 7c8f75f6-3347-4336-aee4-fe279f933842 |
Harvested | True |
Package ID | 6b67a5d2-9051-44d6-ab69-b33315ec94d4 |
State | active |