-
ARCHIVED
Hydrologic indicator results for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Overview The MDBA analysed hydrologic condition in the Basin across a range of metrics or 'flow components'. The immediate results of this analysis and well as the results from... -
ARCHIVED
Modelled hydrologic data for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Overview The hydrologic condition analysis for the 2020 Basin Plan Evaluation drew on data of estimated flows derived from hydrologic modelling done during the development of... -
ARCHIVED
Socio-economic data for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Community Wellbeing Indices. This data set is published in the technical report prepared for the Independent Assessment of the Social and Economic Conditions in the Basin... -
ARCHIVED
Vegetation data for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Overview The reporting of this data is required to meet statutory obligations under the Basin Plan. Reporting against vegetation targets is specified in the Basin Plan as well... -
ARCHIVED
Observed hydrologic data for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Overview The hydrologic analysis that underpinned the Basin Plan Evaluation 2020 drew predominately on watercourse discharge observations made at gauging stations across the... -
ARCHIVED
Catchment inflow data for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Overview Estimates of inflows into catchments was a core component of the hydrologic condition analysis done for the 2020 Basin Plan Evaluation. These catchment inflows were... -
ARCHIVED
Environmental watering data for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Overview The reporting of this data is required to meet statutory obligations under Schedule 12 of the Basin Plan (2012). Reporting of environment water use refers to Matter 9.3... -
ARCHIVED
Fish data for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Overview The fish monitoring analysis that underpinned the Basin Plan Evaluation 2020 drew predominately on annual fish monitoring sampling data, from the Murray--Darling Basin... -
ARCHIVED
Waterbird data for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Overview The aerial waterbird survey (AWS) analysis that underpinned the Basin Plan Evaluation 2020 drew predominately on annual aerial survey data across 38 key wetlands across...
1 - 9 of 9 results