-
Cockrone Lagoon Flood Study
Flood study centres around the opening of Cockrone Lagoon to the ocean when the water level exceeds the let-out-level of RL2.476m AHD. The policy is aimed at minimising the... -
Cockrone Lagoon Floodplain Management Plan
The Floodplain Management Plan divides the Cockrone Lagoon area into six precincts: Cockrone Lagoon - Beach Berm High Hazard Floodway/Investigation Cockrone Lagoon - Entrance... -
Tuggerah Lakes Southern Catchments Flood Study - DTM
Data contains DTM for all catchments -
Wallarah Creek Catchment Flood Study - Hydrology
Wallarah Creek Catchment FS - Hydrology data including: * Calibration * Climate Change * Sensitivity Analysis * Design Rainfall -
Tumbi Umbi Creek Floodplain Risk Management Review and Plan - Report
Report complete (incl. figures and appendices) -
Green Point Creek, Pearl Beach Floodplain Management Study
The Green Point Creek system has been divided into component areas for application of a floodplain management plan. The component areas, illustrated on Figure 13, cover:... -
Northern Lakes Flood Study - Consultation
Contains Brochure, letter and community responses -
Tuggerah Lakes Southern Catchments Flood Study - GIS
Data contains figures, shape files and grids -
Northern Lakes Floodplain Risk Management Study and Plan - Report
Data contains: * Main Report * Mapping -
Avoca Lagoon Floodplain Management Study
Avoca Lagoon is the largest of the four coastal lagoons within Gosford. The lagoon has a cruciform shape with a surface area of 97.5 hectares and average depth of 1.3 metres.... -
Report on Gosford Lagoon Openings June-July 1994
Lagoon Opening data: Wamberal Lagoon and Avoca lake openings Automatic recorder levels Comparison of Wamberal lagoon openings Comparison of Terrigal lagoon openings Comparison... -
waterRIDE - Wyong FRMS&P
Contains the model outputs in WaterRIDE format for each flood simulation completed. -
Gosford Coastal Lagoons Compendium of Data
Compendium of Data to studies conducted on Gosford Coastal Lagoons