-
Proposed laminite quarry and non-putrescible waste and quarry overburden...
EIS: Proposed laminite quarry and non-putrescible waste and quarry overburden disposal depot on lots 21 & 22, Mulgoa : environmental impact statement -
Environmental impact statement for the development of the Girilambone north...
EIS: Environmental impact statement for the development of the Girilambone north copper mines : incorporating additional developments within the Girilambone Copper Mine -
Customised ABS Census Data by Water Sharing Plan (WSP) regions
Secondary data are not available from ABS Agricultural and Population censuses for economic indicators and measures at a scale matching the NSW water sharing plan (WSP) regions.... -
High Ecological Value Waterways and Water Dependent Ecosystems - LANE COVE LGA
A map of the high ecological value waterways and water dependent ecosystems for the Lane Cove LGA was prepared by the Science Division of the Department of Planning, Industry... -
Springvale Colliery February 1994 environmental management plan
Environmental Impact Statement: Springvale Colliery February 1994 environmental management plan -
FOAM - Ferry Opal Assignment Model
This dataset provides an indicator of historic ferry occupancy for individual ferry services from November 2019. The legacy Ferry Opal Allocation Model (FOAM) will be replaced... -
2002 Monthly Hillslope Cover Erosion
Individual Monthly Hillslope Cover Erosion (t.ha-1.month-1) over New South Wales for 2002. -
Tahmoor Mine : washery rejects disposal and emplacements management plan.
Environmental Impact Statement: Tahmoor Mine : washery rejects disposal and emplacements management plan. -
Environmental impact statement for the establishment and operation of a hard...
EIS: Environmental impact statement for the establishment and operation of a hard rock quarry at Seaham Hill, near Raymond Terrace, N.S.W. for BMG (Country) Pty. Limited -
Lachlan River Catchment Wetlands
This regional scale mapping of wetlands in the Lachlan River Catchment was produced to trial methods for Wetland Inventory in NSW. Wetland boundaries were determined by... -
Proposed Regentville substation and transmission connections working papers...
Proposed Regentville substation and transmission connections working papers for environmental assessment -
Further information on proposed extension of existing quarry, located at...
Environmental Impact Statement: Further information on proposed extension of existing quarry, located at Lots 58, 62 & 66, to Lot 69, D.P. 1358 on the corner of Burfitt... -
Soil extraction at Raworth : environmental impact statement.
EIS: Soil extraction at Raworth : environmental impact statement. -
Namoi Valley Coal Project : environmental impact statement
EIS: Namoi Valley Coal Project : environmental impact statement -
Local Development Performance Monitoring 2006-07
The data in this publication provides an overview of development trends in NSW for 2006-07, aspects of the performance of the 152 councils in NSW in assessing local development,... -
Mining, rehabilitation and environmental management plan for the Browns...
Environmental Impact Statement: Mining, rehabilitation and environmental management plan for the Browns Creek Mine : annual report, 1988,volume 2 -
NARCliM2.0 climate projections
What is NARCliM? The New South Wales and Australian Regional Climate Modelling (NARCliM) project develops high-resolution regional climate projections that cover NSW and South-... -
An environmental impact statement for proposed bituminous hotmix plant at Allandale
EIS: An environmental impact statement for proposed bituminous hotmix plant at Allandale -
Conservation research statement recovery plan for Grevillea Caleyi R.BR
Conservation research statement recovery plan for Grevillea Caleyi R.BR -
Identification of corridors of river recovery for NSW Hawkesbury Nepean catchments
By connecting corridors of river recovery, resilience can be built into river systems to mitigate against future floods and droughts driven by anthropogenic disturbance or...