Peak Trains Load Survey - March 2016

Created 07/06/2025

Updated 07/06/2025

This dataset provides estimates of train loads during the AM and PM peak periods - derived from a survey held on Tuesdays, Wednesdays and Thursdays from 1 March 2016 to 17 March 2016. The primary purpose of the train load surveys is to support service planning and rail timetabling. Surveys are conducted in March and September. March loads are the preferred dataset for network planning as it reflects the busiest time of year for train travel and is less subject to seasonal factors. The March loads are usually higher and provide a better gauge of rail system performance.

Files and APIs

Tags

Additional Info

Field Value
Title Peak Trains Load Survey - March 2016
Language English
Licence Creative Commons Attribution 3.0 Australia
Landing Page https://devweb.dga.links.com.au/data/dataset/de5331eb-3870-44f9-af1e-bc7daaabda2f
Remote Last Updated 04/02/2025
Contact Point
Transport for NSW
test@email.loc
Reference Period 09/07/2022
Geospatial Coverage
Map data © OpenStreetMap contributors
{
  "coordinates": [
    [
      [
        96.0,
        -45.0
      ],
      [
        96.0,
        -9.0
      ],
      [
        168.0,
        -9.0
      ],
      [
        168.0,
        -45.0
      ],
      [
        96.0,
        -45.0
      ]
    ]
  ],
  "type": "Polygon"
}
Data Portal DataNSW

Data Source

This dataset was originally found on DataNSW "Peak Trains Load Survey - March 2016". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/2-peak-trains-load-survey-march-2016