Greystanes Creek and Pendle Hill Creek Flood Mitigation Study

Created 06/06/2025

Updated 06/06/2025

Flood mitigation measures were investigated for eliminating flood problems for the 1% annual exceedance probability flood for: Greystanes Creek from Fox Hills Golf Course to Fitzwilliam Road, Toongabbi e, Pendle Hill Creek from the Great Western Highway to Fitzwilliam Road, Toongabbie, and The Confluence Area extending from Fitzwilliam Road, on both creeks, to Toongabbie Creek, including the confluence of Greystanes Creek with Pendle Hill Creek. The capacities of all channels, bridges and culverts in the Study Area were assessed and compared with the 1% flood estimate for existing conditions and for conditions with the upstream retarding basins completed. On the basis of the comparison those structures which were inadequate.

Files and APIs

Tags

Additional Info

Field Value
Title Greystanes Creek and Pendle Hill Creek Flood Mitigation Study
Language English
Licence lsba
Landing Page https://devweb.dga.links.com.au/data/dataset/5acfa429-2a30-4bf6-98cc-47f6576af1c0
Remote Last Updated 25/03/2024
Contact Point
Blacktown City Council
council@blacktown.nsw.gov.au
Reference Period 02/02/2022 - 01/12/1985
Geospatial Coverage
Map data © OpenStreetMap contributors
{
  "coordinates": [
    147.0179,
    -32.1618
  ],
  "type": "Point"
}
Data Portal DataNSW

Data Source

This dataset was originally found on DataNSW "Greystanes Creek and Pendle Hill Creek Flood Mitigation Study". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/nsw-fdp-greystanes-creek-pendle-hill-creek-flood-mitigation-study-fms