From DataNSW

Realignment of Mitchell Highway at Copper Hill, 4 to 6km north of Molong stage one

Created 06/05/2025

Updated 06/05/2025

The proposed realignment of the Mitchell Highway, between 4 and 6km north of Molong, involves the construction of a new bridge over Molong Creek and the construction of a railway crossing. It is proposed that construction of the Proposal proceed in two discreet stages to minimise disruption to traffic. Preliminary investigations into the sensitivity of the Proposal area to Aboriginal heritage significance determined that the banks of Molong Creek were a Potential Archaeological Deposit, requiring detailed investigation prior to the commencement of works. As a result, this REF has been prepared to specifically address the environmental impacts of Stage one of the Proposal.

Files and APIs

Tags

Additional Info

Field Value
Title Realignment of Mitchell Highway at Copper Hill, 4 to 6km north of Molong stage one
Language English
Licence lsba
Landing Page https://devweb.dga.links.com.au/data/dataset/985f6664-8e7c-4479-aefb-5c3537565d1c
Remote Last Updated 08/09/2021
Contact Point
NSW Government
test@email.loc
Reference Period 08/09/2021
Geospatial Coverage {"type": "Polygon", "coordinates": [[ [96.0,-45.0],[96.0,-9.0], [168.0,-9.0], [168.0,-45.0], [96.0,-45.0]]]}
Data Portal data.gov.au

Data Source

This dataset was originally found on DataNSW "Realignment of Mitchell Highway at Copper Hill, 4 to 6km north of Molong stage one". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/3-16710-realignment-of-mitchell-highway-at-copper-hill-4-to-6km-north-of-molong-stage-one