From Geoscience Australia

Ediacara geophysical survey: interim report

ARCHIVED

Created 20/01/2025

Updated 20/01/2025

The geophysical test survey of this field was commenced on 5/6/45 and operations were terminated on 6/8/46 when it was considered advisable to await the results of the drilling campaign for guidance in planning the future geophysical programme. The most intense work was done on the south-east gossan area where the methods used included, electromagnetic, potential-ratio, spontaneous polarisation, magnetic and resistivity. This interim report is supplementary to a detailed report of the survey and refers in detail only to some of the results on the south-east gossan area.

Files and APIs

Tags

Additional Info

Field Value
Title Ediacara geophysical survey: interim report
Language eng
Licence notspecified
Landing Page https://devweb.dga.links.com.au/data/dataset/f9dc67fe-f97c-4669-ad6d-53316df4e864
Contact Point
Geoscience Australia
clientservices@ga.gov.au
Reference Period 20/04/2018
Geospatial Coverage {"type": "Polygon", "coordinates": [[[137.5, -31.0], [138.5, -31.0], [138.5, -30.0], [137.5, -30.0], [137.5, -31.0]]]}
Data Portal data.gov.au

Data Source

This dataset was originally found on data.gov.au "Ediacara geophysical survey: interim report". Please visit the source to access the original metadata of the dataset:
https://devweb.dga.links.com.au/data/dataset/ediacara-geophysical-survey-interim-report

No duplicate datasets found.