Orange Ultimate Flood Modification Scheme Phase A

Created 07/06/2025

Updated 07/06/2025

Phase A comprised an update of the existing DRAINS and TUFLOW flood modelling (developed as part of the Blackmans Swamp Creek and Ploughmans Creek Floodplain Risk Management Study & Plan) for the 1% AEP event from Australian Rainfall & Runoff (ARR) 1987 to ARR 2019 methodology.

Files and APIs

Additional Info

Field Value
Title Orange Ultimate Flood Modification Scheme Phase A
Language English
Licence lsba
Landing Page https://devweb.dga.links.com.au/data/dataset/f4d94d20-e3f1-411a-a2cb-e9719eba5b64
Remote Last Updated 10/07/2024
Contact Point
Orange City Council
council@orange.nsw.gov.au
Reference Period 14/11/2022 - 11/08/2023
Geospatial Coverage
Map data © OpenStreetMap contributors
Data Portal DataNSW

Data Source

This dataset was originally found on DataNSW "Orange Ultimate Flood Modification Scheme Phase A". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/fdp-orange-ultimate-flood-modification-scheme-phase-a