From DataNSW

Railway Culvert Upgrade at Tramway Creek - Detailed Design Report - Hydrologic Model Output

Created 06/05/2025

Updated 06/05/2025

WBNM + also includes an Excel summary of results.

Files and APIs

Tags

Additional Info

Field Value
Title Railway Culvert Upgrade at Tramway Creek - Detailed Design Report - Hydrologic Model Output
Language English
Licence lsba
Landing Page https://devweb.dga.links.com.au/data/dataset/77a3d49e-84b3-4149-bdcd-1cc23a728555
Remote Last Updated 25/03/2024
Contact Point
Wollongong City Council
records@wollongong.nsw.gov.au
Reference Period 02/02/2022 - 25/07/2014
Geospatial Coverage New South Wales (NSW81093)
Data Portal data.gov.au

Data Source

This dataset was originally found on DataNSW "Railway Culvert Upgrade at Tramway Creek - Detailed Design Report - Hydrologic Model Output". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/fdp-tramway-creek-upgrade-detailed-design-report-hydrologic-model-output

No duplicate datasets found.