From Geoscience Australia

Murray Basin Hydrogeological project : progress report 13 for half year ending 31 March 1985

ARCHIVED

Created 20/01/2025

Updated 20/01/2025

At Bureau of Mineral Resources, Project staff concerned with the geological phase have devoted much effort to checking and editing bore hole stratigraphic data and in compiling a report on the subsurface stratigraphic database; these tasks have proceeded in parallel with the computer-assisted drawing of structure contour maps of stratigraphic units and aquifers. The cartographic work, together with the writing of a text on the geology of the Basin, is continuing. A preliminary edition of a 1:1 million scale Cainozoic geology map of the Basin was published in February. Work on the hydrogeological aspects of the Project continued with the compilation of data from four 1/4 million scale map sheets, and some water sampling in previously little known areas.

Files and APIs

Tags

Additional Info

Field Value
Title Murray Basin Hydrogeological project : progress report 13 for half year ending 31 March 1985
Language eng
Licence notspecified
Landing Page https://devweb.dga.links.com.au/data/dataset/31d782ae-498a-4e74-8e2c-ba978c204d45
Contact Point
Geoscience Australia
clientservices@ga.gov.au
Reference Period 20/04/2018
Geospatial Coverage http://www.ga.gov.au/place-names/PlaceDetails.jsp?submit1=GA1
Data Portal data.gov.au

Data Source

This dataset was originally found on data.gov.au "Murray Basin Hydrogeological project : progress report 13 for half year ending 31 March 1985". Please visit the source to access the original metadata of the dataset:
https://devweb.dga.links.com.au/data/dataset/murray-basin-hydrogeological-project-progress-report-13-for-half-year-ending-31-march-1985

No duplicate datasets found.