MURRUMBURRAH FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN 2019-2020

Created 07/06/2025

Updated 07/06/2025

The Murrumburrah Flood Study (Reference 1), the first stage of the management process was completed in December 2019. The Murrumburrah Floodplain Risk Management Study and Plan constitutes the second and third stage of the management process for the catchment. This study has been prepared by WMAwater for Hilltops Council and was undertaken to provide the basis for future management of flood liable lands within the study area. This report has been prepared with financial assistance from the NSW Government through its Floodplain Management Program. This document does not necessarily represent the opinions of the NSW Government or the Department of Planning, Industry and the Environment. The Murrumburrah Flood Study provided information about existing flood risk in the Currawong Creek catchment, which is also known locally as Murrimboola Creek. Flood modelling tools were developed In the Flood Study that can be used by Council for decision-making about land-use planning, and in future studies such as the current Murrumburrah Floodplain Risk Management Study and Plan to assess the effectiveness of potential measures to reduce flood risk.

Files and APIs

Additional Info

Field Value
Title MURRUMBURRAH FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN 2019-2020
Language English
Licence lsba
Landing Page https://devweb.dga.links.com.au/data/dataset/d5583982-75e6-456b-800e-3381a7969bf0
Remote Last Updated 16/07/2024
Contact Point
Hilltops Council
mail@hilltops.nsw.gov.au
Reference Period 01/06/2019 - 25/11/2020
Geospatial Coverage
Map data © OpenStreetMap contributors
{
  "coordinates": [
    147.0179,
    -32.1618
  ],
  "type": "Point"
}
Data Portal DataNSW

Data Source

This dataset was originally found on DataNSW "MURRUMBURRAH FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN 2019-2020". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/nsw-fdp-murrumburrah-floodplain-risk-management-study-and-plan-2019-2020