Railway Culvert Upgrade at Tramway Creek - Detailed Design Report - Hydrologic Model Output

Created 06/06/2025

Updated 06/06/2025

WBNM + also includes an Excel summary of results.

Files and APIs

Tags

Additional Info

Field Value
Title Railway Culvert Upgrade at Tramway Creek - Detailed Design Report - Hydrologic Model Output
Language English
Licence lsba
Landing Page https://devweb.dga.links.com.au/data/dataset/77a3d49e-84b3-4149-bdcd-1cc23a728555
Remote Last Updated 25/03/2024
Contact Point
Wollongong City Council
records@wollongong.nsw.gov.au
Reference Period 02/02/2022 - 25/07/2014
Geospatial Coverage
Map data © OpenStreetMap contributors
{
  "coordinates": [
    147.0179,
    -32.1618
  ],
  "type": "Point"
}
Data Portal DataNSW

Data Source

This dataset was originally found on DataNSW "Railway Culvert Upgrade at Tramway Creek - Detailed Design Report - Hydrologic Model Output". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/nsw-fdp-tramway-creek-upgrade-detailed-design-report-hydrologic-model-output