Survey Name: East Tasmania
Datasets Acquired: Magnetics, Radiometrics and Elevation
Geoscience Australia Project Number: P5020
Acquisition Start Date: 20/03/2022
Acquisition End Date: 23/06/2022
Flight line spacing: 200 m
Flight line direction: East-West (090-270)
Total distance flown: 57,709 line-km's
Nominal terrain clearance: 80 m
Data Acquisition: Magspec Airborne Surveys Pty Ltd
Project Management: Geoscience Australia
Quality Control: Geoscience Australia
Dataset Ownership: Geoscience Australia and Mineral Resources Tasmania
Datum: Geocentric Datum of Australia 2020 (GDA2020)
Projection: Map Grid of Australia 55 (MGA55)
Included in this release:
Point-located Data - ASCII-column (.dat) or NetCDF (.nc) format.
• Magnetic diurnal;
• Magnetics raw-edited;
• Magnetics reduced;
• Radiometrics raw-edited;
• Radiometrics reduced.
Gridded data - ERMapper (.ers) format.
• Total magnetic intensity (TMI);
• TMI reduced to pole (RTP);
• TMI RTP with first vertical derivative (1VD) applied;
• Dose rate (with NASVD and standard processing);
• Potassium concentration (with NASVD, standard processing);
• Thorium concentration (with NASVD, standard processing);
• Uranium concentration (with NASVD, standard processing);
• Radar-derived digital elevation model (geoidal).
Reports.
• Calibration report;
• Operations and processing summary report.
© Commonwealth of Australia (Geoscience Australia) and Mineral Resources Tasmania, Government of Tasmania 2022. With the exception of the Commonwealth Coat of Arms and where otherwise noted, this product is provided under a Creative Commons Attribution 4.0 International Licence (http://creativecommons.org/licenses/by/4.0/legalcode).